Linn Post and Piipe, Inc - Linn, KS




In 1979 the Nebraska division of Linn Post & Pipe Supply opened for business.  Emil Peters had wanted to expand his growing business too accommodate farmers and ranchers in the northern United States and Creighton, NE became the home of a complete sales and manufacturing facility.  Many expansions have been made at this facility over the years that have made this facility not only a manufacturing center but also a distribution center for all Linn Post & Pipe Supply products enabling us to better serve our customers needs.      

Single Alleyway System

Manufactured in Creighton, NE this heavy duty all steel system saves cattlemen time, money, and effort while working cattle.  Built to handle all sizes of cattle that can be worked quickly and easily with our single lever adjustment that adjusts the entire alleyway at one time from 32" wide down to 18" in seconds.  The heavy duty crowding tub is able to be setup to crowd cattle to the left or right depending on your requirements and allows you to exit cattle out of the tub in two different directions.  A basic system shown above includes a 10' radius crowding tub and 20' adjustable alleyway.

Specifications
Adjustable Alleyway Features
  • Heavy 14ga sheeting
  • 2-3/8" Pipe Frame
  • Fold down catwalks
  • Built in front palpation door
  • Single lever adjustment
  • Overhead no-back system
  • Specifications
    Crowding Tub
  • Heavy 14ga sheeting
  • 4-1/2" dia. Pivot post
  • 7' Head clearance
  • 66" Sidewall height
  • Double Alleyway System


    Twin side by side alleyways make a large 6’ entrance enticing for cattle to enter and then transitions the cattle into a single alleyway before entering a chute.  A double alleyway system is a efficient set up for loading out cattle or to keep the flow of cattle consistent for the chute.  Outside panels are sheeted while on the inside the cattle can see thru, this allows them to see each other but not any of the distractions on the outside.  Cattle then remain calmer and compete with each other to get to the chute increasing the efficiency of your operation.  A double alleyway can be paired with a tub as shown above or used with a Bud box depending on your operation.

    Specifications
  • Heavy 14ga sheeting
  • 2-3/8" Pipe frame
  • Fold down catwalks
  • Built in front palpation door
  • Single lever adjustment
  • 3 Overhead no-back system


  • Linn Post & Pipe Supply Inc.
    Box 137
    Creighton, NE 68729
    1-800-638-4036
    Linn Post & Pipe Supply Inc.
    Box 276
    Linn, KS 66953
    1-800-526-0993